Arb RD127 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pour la voiture Arb RD127. ARB RD127 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - INSTALLATION GUIDE

INSTALLATION GUIDE RD127 Part No. 2102127Revision Date 16/01/2008Copyright © 2008 by ARB Corporatio

Page 2 - ARB 4x4 ACCESSORIES

2 Removing the Existing Differential 8 2.6 Removing the differential carrier  Remove the adjuster nut locking tabs.  Remove the bearing cap

Page 3

3 Installing the Air Locker 9 3.1 Mounting the Ring Gear  Remove the bolts that hold the ring gear in place.  Using a plastic or copper ham

Page 4

3 Installing the Air Locker 10 Figure 4. 3.2 Installing the Carrier Bearings  Apply a thin film of high pre

Page 5 -  symbols as

3 Installing the Air Locker 11 3.3 Drilling and Tapping the Bulkhead Port An air line port must be drilled and tapped through th

Page 6 - Supplies

3 Installing the Air Locker 12 3.4 Final Air Locker Assembly  Clean all parts of the differential assembly, paying particular attention to

Page 7 - Differential Fluid Drain

3 Installing the Air Locker 13 Figure 7.  Insert the original adjuster nut onto the opposite side of the differential and t

Page 8 - Marking the Bearing Caps

3 Installing the Air Locker 14 3.5 Checking the Backlash  Set a depth indicator on one of the ring gear teeth (Fig.8.).  While supportin

Page 9 - IMPORTANT:

3 Installing the Air Locker 15 3.6 Installing the Seal Housing  Make sure the grooves and airway of the seal housing are clean and free fr

Page 10 -

3 Installing the Air Locker 16 3.6.1 Roll Pin Type  If your diff has roll pins instead of locking tabs, slightly rotate the adjuster nut so

Page 11 - Mounting the Ring Gear

3 Installing the Air Locker 17  Install the spring clip by first hooking both ends of the clip into the small aligned cutouts of the seal housi

Page 12 - Figure 5

No liability is assumed for damages resulting in the use of the information contained herein. ARB AIR LOCKER Locking Differentials and AIR LOCKER a

Page 13 - Figure 6

3 Installing the Air Locker 18 NOTE : Use an automotive brake line tubing cutter to cut the seal housing tube, never a hacksaw as this will

Page 14 - Final Air Locker Assembly

3 Installing the Air Locker 19 Figure 14. NOTE : Excessive tightening of the center compression nut is not necessary to fo

Page 15 - CLEARANCE REQUIRED

3 Installing the Air Locker 20 3.8 Profiling the Seal Housing Tube  With the seal housing tube now firmly secured into the bulkhead fitting

Page 16 - Checking the Backlash

3 Installing the Air Locker 21 Figure 17. Figure 18. IMPORTANT: In order for the seal housing to float and s

Page 17 - Installing the Seal Housing

3 Installing the Air Locker 22 3.9 Bench Testing the Air Locker  To test the Air Locker, when 620kPa [90 PSI] shop air is applied to the sea

Page 18 - Roll Pin Type

3 Installing the Air Locker 23 3.10 Reinstalling Differential and Axles  Reinstall the third member to the differential housing according t

Page 19

4 Installing the Air System 24 4.1 Mounting the Solenoid 4.1.1 Connection to an ARB Air Compressor (Fig.20.)  Remove one of the 1/8” BS

Page 20 - Figure 13

4 Installing the Air System 25 4.1.2 Connection to an Alternate Air Source For ease of installation, quality of air supply, and a high level

Page 21 - Figure 14

4 Installing the Air System 26 4.2 Running and Securing the Air Line The path taken by the air line from your air source (i.e., compressor)

Page 22

4 Installing the Air System 27 NOTE : To remove the air line from the push-in fitting; pull outward on the flange of the fitting, push the ai

Page 23

Table of Contents: 1 1 Introduction 31.1 Pre-Installation Preparation 31.2 Tool-Kit Recommendations 4 2 Removing the Existing Differe

Page 24 - Bench Testing the Air Locker

4 Installing the Air System 28 HINT : If the support tube is too difficult to insert, place the end of the air line into a cup of boiled wat

Page 25

5 Mounting & Connecting the Electrical System 29 5.1 Mounting the Actuator Switch(es) Air Locker actuator switch(es) can be easily pane

Page 26 - Air Compressor

5 Mounting & Connecting the Electrical System 30 5.2 Wiring the Actuator System 5.2.1 Connection to an ARB AIR COMPRESSOR When wiri

Page 27 - IMPORTANT :

5 Mounting & Connecting the Electrical System 31 SWITCHTERMINALIDENTIFICATIONUP Figure 24. 5.2.2 Connection to an Alternate Ai

Page 28

5 Mounting & Connecting the Electrical System 32 5.2.2.2 Dual Air Locker System  If two Air Lockers are to be installed in the system

Page 29

6 Testing & Final Assembly 33 6.1 Leak Testing  With the vehicle parked and the engine off, turn the compressor on and wait until the a

Page 30

6 Testing & Final Assembly 34  Turn the compressor (or alternate air source) on to charge the air supply up to its maximum pressure.  Rota

Page 31 - Figure 22

6 Testing & Final Assembly 35 6.4 Post-Installation Check List Now that the Air Locker installation has been completed, ARB recommends t

Page 32 - Wiring the Actuator System

6 Testing & Final Assembly 36

Page 33 - IDENTIFICATION

7 Parts List 37 7.1 Exploded Assembly Diagram (See itemized parts list overleaf) Figure 27.

Page 35 - Leak Testing

7 Parts List 38 7.2 Itemized Parts List (See exploded diagram Figure 27.) AIR LOCKER MODEL No. : RD127 ITEM # QTY DESCRIPTION

Page 36 - Filling the Differential

3 IMPORTANT : BEFORE ATTEMPTING TO DISMANTLE YOUR VEHICLE FOR THIS INSTALLATION, PLEASE READ THIS INSTALLATION GUIDE IN ITS ENTIRETY, AS WELL AS

Page 37

2 Removing the Existing Differential 4 1.2 Tool-Kit Recommendations Below is a list of tools and supplies you may need to complete this ins

Page 38

2 Removing the Existing Differential 5 2.1 Vehicle Support  Safely secure the vehicle on a hoist. We recommend supporting the vehicle on a c

Page 39 - Exploded Assembly Diagram

2 Removing the Existing Differential 6 2.4 Marking the Bearing Caps  Using a small pointed center punch, gently mark the bearing caps in a

Page 40 - Itemized Parts List

2 Removing the Existing Differential 7 2.5 Checking the Current Backlash Amount IMPORTANT: This step is a precautionary measure recommended

Commentaires sur ces manuels

Pas de commentaire