Arb RD74 Manuel d'utilisateur Page 22

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 21
3 Installing the Air Locker
20
3.9
Bench Testing the Air Locker
To test the Air Locker, when 620kPa [90 PSI] shop air is applied to
the seal housing tube, the Air Locker should engage.
Check all fittings and the seal housing for air leaks.
Rotate the differential carrier by turning the pinion flange whilst
applying air pressure.
NOTE : An accurate way to test for air leaks is to fit a shut-off
valve to an air pressure gauge.
(ARB part # ALTG01 shown in Fig.16.).
Once 620 KPA [90 PSI] is reached close the valve,
disconnect the air hose, and watch to see if there is any
drop in pressure. If so, this will indicate an air leak.
Figure 16.
If a leak is found to be present, spray a soap and water mixture onto
the bulkhead air fitting. Bubbles should appear at any leak points.
NOTE : Do not spray this soapy mixture inside the differential.
Check that leaky fittings have been adequately tightened.
Disassemble, clean threads, and reapply thread sealant if leaking
persists.
If a leak is found at the seal housing, carefully remove and refit. Be
very careful with the O-rings and check they have not been
damaged during installation.
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 35 36

Commentaires sur ces manuels

Pas de commentaire