Arb RD107 Manuel d'utilisateur Page 29

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 48
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 28
4 Installing the Air Locker
27
4.11 Setting Up the Bulkhead Fitting
c Apply thread sealant to the threads of the bulkhead body.
c Screw the bulkhead body into the tapped hole, and tighten.
c Wipe the area clean of any excess thread sealant (inside and
outside of the housing).
c Insert the free end of the seal housing tube into the bulkhead fitting
until it protrudes approximately 8mm [5/16”] through the other side.
c From the outside of the housing, assemble the small O-ring over
the top of the short length of seal housing protruding through the
bulkhead fitting.
c While still holding the seal housing tube into the bulkhead fitting,
insert the small drilled end of the center compression nut over the
extended tube as shown in the assembly diagram (Fig.20.), and
screw it into the bulkhead body, and lightly tighten.
NOTE : Be sure to insert the correct end of the center
compression nut into the bulkhead body. The thread
has been partially relieved on the bulkhead side of the
center compression nut to visually identify its
orientation. (Fig.20.)
Figure 20.
Vue de la page 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 47 48

Commentaires sur ces manuels

Pas de commentaire