Arb RD158 Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 38
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
5 Installing the Air System
26
5.3 Connection to the Bulkhead Fitting
Trim the air line to length using a sharp knife.
Insert the support spring over the end of the air line - small end first.
(Fig.
16.)
Insert the outer compression nut over the air line.
Push the airline onto the barb on the center compression nut,
ensuring that it is pushed all the way to the end.
Figure 16.
HINT : If the tube is too difficult to push on, place the end of
the air line into a cup of boiled water to soften the
tubing.
Screw on the outer compression nut and tighten, while supporting
the center compression nut with a 3/8” spanner. The airline is now
attached to the center compression nut.
NOTE : The outer compression nut will tighten against a stop.
Over tightening will not create a better seal.
Assemble the support spring over the outside of the outer
compression nut.
Secure any loose sections of tube with a cable tie.
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 37 38

Commentaires sur ces manuels

Pas de commentaire