6 Testing & Final Assembly
40
6.5 Post-Installation Check List
Now that the Air Locker installation has been completed, ARB
recommends that you take the time to complete the following check list
just to insure that you haven’t missed any of the vital steps.
F The air system has been leak tested.
F Thread locking compound was used on the ring gear bolts.
F All torque settings comply with the vehicle manufacturer’s specs
and were set with an accurate torque wrench.
F Differential fluid complies with ARB recommendations and has
been filled to the correct level.
F All air lines and wiring have been securely cable tied to resist
snagging.
F Switch(es) have been securely mounted within operator reach, yet
well away from danger of accidental engagement.
F Switch(es) function properly and illuminate to indicate that Air
Locker(s) are engaged.
F All operators who are to use the Air Locker have read, and fully
understand the ARB Air Locker Operating & Service Manual.
F The Air Locker Warning Sticker has been located within close
proximity of the actuator switch(es).
INSTALLATION PERFORMED BY:
DATE OF INSTALLATION:
ODOMETER READING:
ARB AIR LOCKER SERIAL No:
___________________________
___________________________
___________________________
___________________________
Vue de la page 41
1 2 ... 37 38 39 40 41 42 43 44

Commentaires sur ces manuels

Pas de commentaire